Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 1 de 1
Filter
Add filters








Language
Year range
1.
China Medical Equipment ; (12): 51-53, 2015.
Article in Chinese | WPRIM | ID: wpr-474011

ABSTRACT

Objective:Through the construction of the Bank-Hospital connecting project, the enduring problems in clinic such as the long waiting time at registration, check out, payment, and other non-clinic issues are solved. Meanwhile, the clinic medication procedure is further regulated, which provides a faster medical assistance service for patients and elevates the ability to apply medical informationization.Methods:Based on the current HIS platform, the banking and mobile systems connected as a whole network and constructed the banking-medication platform. Results: The waiting time of patients is largely reduced by expanding the channels of registration, applying multiple cards as medication card, and introducing local charging, self-payment systems at every floor, and mobile intelligent platform.Conclusion: The Bank-Hospital connecting project brings convenience to patients and increases our efficiency.

SELECTION OF CITATIONS
SEARCH DETAIL